Determine the materials needed for the headers of the garage shown in Figure 14.63.The personnel door is 3 feet wide.
What will be an ideal response?
The header for the personnel door is 3?3? long. Order 1 piece 2 × 10 at 8? long. Additionally about three square feet of OSB will be needed as a spacer. The header for the overhead door is 16?6? long. Order 2 pieces 1 ¾ × 9 ½ LVL at 17? long.
You might also like to view...
1. A board foot is a unit of measurement for lumber equal to:
a. 1-in ´ 12-in ´ 12-in c. 3-in ´ 12-in ´ 12-in b. 2-in ´ 12-in ´ 12-in d. 4-in ´ 12-in ´ 12-in
At what relative speed must an inlet metering, opposed plunger injection pump be driven when used to fuel a 4-stroke cycle diesel engine, with 6 engine cylinders?
A. half engine speed B. engine speed C. two times engine speed D. six times engine speed
Nitrogenous waste from birds is called ____________________ acid
Fill in the blank(s) with correct word
Technician A says that steering linkages with zerk fittings should be greased at least every six months. Technician B says that some steering linkage joints are sealed and do not require regular service. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician