For Category I appliances, what is the first item in the venting system that is installed?
a. vent terminal
b. draft hood
c. vent connector
d. automatic vent damper
ANSWER: b
You might also like to view...
What kind of landfill is needed for other kinds of MSW?
What will be an ideal response?
What is meant by the “critical point” of refrigerants like CO2?
a. The temperature above which it can’t condense no matter how high the pressure. b. The temperature where it exists in 3 states: liquid, vapor, and solid. c. The temperature at which it may explode if too much pressure is applied.
What is used to signal accelerator position to an Allison ECAT ECU?
A. analog potentiometer type TPS B. digital Hall-effect TPS C. governor feedback signal D. either A or B
Which of the following is concerned with long-term planning of manufacturing activity?
A) MRP B) master production scheduling C) master planning D) sales and operations planning E) production activity control