Explain why logical sequencing is key to a successful project.
What will be an ideal response?
Logical sequencing is most important in planning and scheduling. Care should be taken to ensure correct sequencing, with the necessary activities preceding each activity. Considerable disruption can be caused by careless sequencing. If subcontractors are scheduled to arrive and work on the project, they will require that the necessary adjoining and substrate work be completed, and they will often leave the jobsite if this preliminary work is not done. The schedule is a guide and should be changed if the logic is not correct. The logic, or proper sequencing, is the key to a successful project. All parties involved should review the logic of the project prior to completion of the schedule.
You might also like to view...
A(n) ____________________ detects intake manifold absolute pressure.
Fill in the blank(s) with the appropriate word(s).
When would a direct connection be advisable?
What will be an ideal response?
An advantage of a ____ is that the brace, being flush with the face of the studs rather than placed between them, does not interfere with the installation of insulation or electrical wiring.
A. let-in brace B. soleplate-top plate brace C. continuous brace D. diagonal brace
What should be done to prepare an oil pump for operation in a one-pipe oil delivery system?
A) The internal bypass plug should be removed. B) The internal bypass plug should be installed. C) The oil burner motor must be set for high speed. D) The oil burner must be set for low speed.