Solve the problem.A construction crane lifts a bucket of sand originally weighing  at a constant rate. Sand is lost from the bucket at a constant rate of. How much work is done in lifting the sand ? (Neglect the weight of the bucket.)

A. 9000 ft ? lb
B. 7200 ft ? lb
C. 8100 ft ? lb
D. 9900 ft ? lb


Answer: C