A ________ structure is a flat organization with one person as the central decision-making figure.
A. simple
B. client-based
C. functional
D. matrix
E. product
Answer: A
You might also like to view...
If the most optimistic time for completing an activity is 8, the most likely time is 12, and the most pessimistic time is 20, then the estimated time for the activity is ______.
A. 12.7 B. 14.9 C. 18.2 D. 6.7
Common ____ verbs include am, is, are, was, were, be, being, and been
A) helping B) action C) linking D) transitive
"Danny, in our budget for next year, I want to include two new CNC machining stations. Technology is passing us by, and we need to catch up," said Peter Morgan, plant manager, to his production supervisor. "I want you to start studying what is available for us to purchase. Go to a tradeshow if possible. Read some technical journals. Visit some suppliers. I'll need some descriptive and budgetary information from you in two months." Danny will be engaging in
A. gap analysis. B. reverse engineering. C. environmental scanning. D. a technology audit. E. a SWOT analysis.
From the viewpoint of the insurer, all of the following are characteristics of an ideally insurable risk EXCEPT
A) The loss must be accidental. B) The loss should be catastrophic. C) The premium must be economically feasible. D) There must be a large number of exposure units.