On a project, actual negotiations can begin _____.

a. after the bid has been negotiated and awarded
b. during the bidding process
c. at the first coordination meeting
d. during the review of the scope statement


a. after the bid has been negotiated and awarded

Trades & Technology

You might also like to view...

Washington's decision to retire from the presidency in 1797

A. paved the way for Thomas Jefferson to step into the presidency. B. established a two-term tradition for American presidents. C. was capped off with a powerful Farewell Address, delivered before thousands of people. D. had political leaders singing his praises for his accomplishments and dedication. E. led England to see the fledgling nation as vulnerable.

Trades & Technology

A chemical engineer at Western Refining esti­mated the total cost for a diesel fuel desulfuriza­tion system at $2.3 million. If the direct cost factor is 1.55 and the indirect cost factor is 0.43, what is the total equipment cost? Both factors apply to de­livered equipment cost.

What will be an ideal response?

Trades & Technology

What are the precautions that should be taken during multiple-lifting procedures in steel erection?

What will be an ideal response?

Trades & Technology

A paddle wheel detector is a __________-type of level measurement instrument.

A. point B. continuous

Trades & Technology