Distinguish between CMMI and its predecessor CCM.

What will be an ideal response?


The original CMM was developed and upgraded by the Software Engineering Institute throughout the 1990s as a complete SPI framework. Today, it has evolved into the Capability Maturity Model Integration (CMMI), a comprehensive process meta-model that is predicated on a set of system and software engineering capabilities that should be present as organizations reach different levels of process capability and maturity. The CMMI represents a process meta-model in two different ways: (1) as a "continuous" model and (2) as a "staged" model. The continuous CMMI meta-model describes a process in two dimensions (process area and capability). Each process area (e.g., project planning or requirements management) is formally assessed against specific goals and practices.

Computer Science & Information Technology

You might also like to view...

Each presentation ____ contains objects such as titles, items in a bulleted list, graphics, and charts.

A. slide B. chart C. worksheet D. video clip

Computer Science & Information Technology

You should leverage your connections at a potential employer to learn more about the company and see if you would want to work there

Indicate whether the statement is true or false

Computer Science & Information Technology

To display the Draw pointer, you click the Draw Table button in the:

A) Table Tools Design group on the Draw Borders tab. B) Draw Borders group on the Modify Table Tools tab. C) Modify Table Tools group on the Draw Borders tab. D) Draw Borders group on the Table Tools Design tab.

Computer Science & Information Technology

In databases, a data category is called a ________.

A. table B. record C. worksheet D. field

Computer Science & Information Technology