¿Cuál de los siguientes elemen- tos se usa en la obra para trasla- dar el concreto de los camiones de entrega de concreto elabo- rado a los lugares de colocación tanto en dirección horizontal como vertical?

a. una mezcladora para gran-
des volúmenes

b. una canaleta de caída
c. una manga articulada
d. una bomba pluma de
concreto


Answer: D

Trades & Technology

You might also like to view...

When the measured activity is outside the baseline parameters in a behavior-based IDPS, it is said to exceed the ____ (the level at which the IDPS triggers an alert to notify the administrator).

A. baseline level B. footprint level C. clipping level D. root level

Trades & Technology

What is the importance of prioritizing your work into the four classes of importance?

What will be an ideal response?

Trades & Technology

Preload causes a slight drag as a shaft is rotated and can cause bearing damage.

a. true b. false

Trades & Technology

When a process has a definite on and off operation, or a sequence of successive operations, a(n) ____________________ timer is generally used.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology