Which two are true about the Risk badge in vRealize Operations? (Choose two.)
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
Answer:
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
You might also like to view...
What is used to reduce the file size of a file or folder
a. defragmenter b. compression c. extraction d. shrinker
In Project 2013, you can switch from one view to the other using the ________, which appears at the left-hand side of the project window
Fill in the blank(s) with correct word
As shown in the accompanying figure, Word shades a shaded area from the left margin to the right margin of the current paragraph.
Answer the following statement true (T) or false (F)
Jane, a human resources employee, receives an email from a family member stating there is a new virus going around. In order to remove the virus, a user must delete the Boot.ini file from the system immediately. This is an example of which of the following?
A. Hoax B. Spam C. Whaling D. Phishing