The _____ resolves conflicts between drawings and specifications.
a. project manager
b. architect/engineer
c. owner's construction manager
d. owner's design-build contractor
b. architect/engineer
You might also like to view...
The delegates of the Hartford Convention adopted resolutions in 1814 that included a call for
A. a constitutional amendment requiring a two-thirds vote in Congress before war could be declared, new states admitted, or a trade embargo instituted by the federal government. B. New England's secession from the Union. C. a separate peace treaty between New England and the British. D. a Constitutional Convention to address New England's political and economic grievances and objections that stemmed from the War of 1812. E. a suspension of peace negotiations with Britain in Ghent, Belgium.
The contacts of a contactor should be replaced if _____.
a. the contactor is more than two years old b. less than 12" remains c. less than 1/64" remains d. they get dirty
Describe six management practices that reduce or help to control turfgrass
diseases.
What will be an ideal response?______________________________ peat has a slower decomposition rate than sphagnum peat moss
Fill in the blank(s) with correct word