Firms will generally make-to-order when:
A) there are many product options.
B) product is expensive to make and store.
C) products are produced to customer specifications.
D) all of the above
E) none of the above
D
You might also like to view...
Because changes to the original design may need to be made during construction, the contractor keeps track of them on a set of ____ plans.
A. as-built B. concurrent C. final D. floor
When comparing two measurements, the rule of thumb is that for every 100' measured, the difference between the two readings should be no more than _____.
a. 1/100 of a foot b. 1/10 of a foot c. 1 inch d. 1 foot