An IR remote control sends a 25-bit sequence every 0.01 s. The data rate of this remote control equals _______ bps.

Fill in the blank(s) with the appropriate word(s).


2500. 25 bits/0.01 s= 2,500 bps

Trades & Technology

You might also like to view...

The duration of a construction project is considered ____________ because it has a specific start date and a specific end date.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

You have steam available to add energy to a system via mass flow. The enthalpy of the steam is 2750 kJ/kg, and the velocity of the steam is 120 m/s. The potential energy of the steam is negligible. If you must add 33.1 MW of energy to the system with this steam, what is the required mass flow rate of steam entering the system?

Given: E?massflow = 33,100 kW; h = 2750 kJ/kg; V = 120 m/s; z = 0 m; What will be an ideal response?

Trades & Technology

Which is stronger, a 6 point or a 12 point socket?

What will be an ideal response?

Trades & Technology

Your future company has been presented with an opportunity to invest in a project with the following cash flow for ten years. If the company would like to make at least 8% on its investment, would you invest in the project?

Trades & Technology