When engineering drawings are combined with the shop drawings to form a set of precast concrete ____, the metals sheet becomes the first sheet in the set and contains the master legend and the general notes for the job.

A. structural design drawings
B. engineering blueprints
C. working drawings
D. project drawings


Answer: C

Trades & Technology

You might also like to view...

The project manager must ensure that historical information reported _____.

a. supports the bidding process b. reflects performance in the field c. will validate project estimates d. alerts management regarding outside contractor bids PROJECT

Trades & Technology

Which federal agency is responsible for certifying any new highway truck diesel engine before it can be operated on our highways?

A. Environmental Protection Agency (EPA) B. Society of Automotive Engineers (SAE) C. American Trucking Association (ATA) D. California Air Resources Board (CARB)

Trades & Technology

All that is required to prepare a quick and accurate elemental estimate is the basic size and shape of the building and its use and location, as well as historical cost data of similar buildings constructed at the same general location.

Answer the following statement true (T) or false (F)

Trades & Technology

Layout lines scribed with a height gage should be:

A) Scribed so that a permanent mark is left on the workpiece B) Short, dashed lines C) Only deep enough to remove the layout dye D) Scribed repeated times to insure a visible mark

Trades & Technology