Calibration procedures are performed ____.
A. before new instrument installation
B. after extended shutdown
C. after repair
D. if the product being manufactured does not meet specifications
E. any of the above
Answer: E
You might also like to view...
Answer the following statements true (T) or false (F)
1 When working with pumps, technicians should make sure water is collecting under the oil. 2 Interlock systems are used to bypass emergency shutdown systems in order to keep production running so a particular unit can meet its production goals. 3 Compressors move liquids, and pumps move gases. 4 When a dynamic compressor is backed up to its surge point on the compressor’s performance curve it may stall. 5 Gas and steam turbines are activated by the expansion of fluid on a series of curved rotor vanes attached to a central shaft.
The majority of power stations are classified as ____, which use heat to create steam that turns a turbine generator
a. grid power generating plants c. kinesthetic generating plants b. potential energy generating plants d. thermal generating plants
A short circuit can be located using a __________
A) Gauss gauge B) Tone generator C) Test light D) All of the above
Airless welding with a smaller rod helps eliminate two troublesome problems: panel warpage and ______________________________.
Fill in the blank(s) with the appropriate word(s).