El Paso Water (EPW) purchases surface water for treatment and distribution to EPW customers from the County Water Improvement District during the irrigation season. A new contract between the two entities resulted in a reduction in future price in­creases in the cost of the water from 8% per year to 4% per year for the next 20 years. The cost of water next year (which is year 1 of the new contract) will be $260 per acre-ft. Using an interest rate of 6% per year,

(a) Determine the present worth of the savings (in terms of $/acre-ft) to EPW between the old and the new contracts.
(b) Determine the total present worth of the sav­ings over the life of the contract if EPW uses 51,000 acre-ft per year.


Trades & Technology

You might also like to view...

The symbol above denotes a limit switch that is ____.

a. Normally Open in the Unoperated Condition b. Normally Open in the Operated Condition c. Normally Closed Held Open d. Normally Open Held Closed

Trades & Technology

As productive land becomes scarce among the global resources, food production will become more

concentrated on which environment?

a. inland river c. tropical b. coastal d. ocean

Trades & Technology

The subsequent problems deal with the figure below. Assume all outputs are low to begin with unless indicated otherwise.If buttons B1 and B2 are both being held down, what is the value for PORTB.1?

A. ?1 B. ?5 C. 0 D. 5 E. 1

Trades & Technology

Technician A says most transmission solenoids must be removed as an assembly. Technician B says the clutch housing is the mounting place for most transmission solenoids. Who is correct?

A. A only B. B only C. Both A and B D. Neither A nor B

Trades & Technology