In a medical facility, receptacles should be mounted _____.

a. 18" (450 mm) above the floor
b. 24" (600 mm) above the floor
c. 30" (750 mm) above the floor
d. 36" (900 mm) above the floor


b. 24" (600 mm) above the floor

Trades & Technology

You might also like to view...

Five PV panels weigh 170 lbs.  A roof framing has a limit of 578 lbs.  How many panels would the roof support??

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Bacon comes from the leg of the pig

Indicate whether the statement is true or false

Trades & Technology

All of the following statements are true EXCEPT:

A. if an engine failed due to an overheating problem, it is possible that the sensors for coolant temperature and the fan relay could be defective. B. sometimes a piston will seize in the cylinder due to an air leak in the intake manifold or a fuel system problem, resulting in too lean an air-fuel mixture. C. any fuel and cooling system hoses that are not in excellent condition must be replaced. D. if a problem is one that is not the responsibility of the rebuilder, under the terms of the warranty the rebuilder is still liable for the cost of the repair.

Trades & Technology

On the Conservation Philosophy Continuum, what kind of person advocates using changing some aspect of nature to

make it more valuable and profitable?

What will be an ideal response?

Trades & Technology