Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the Distributed Switch has been configured with a Network Profile.
D. Verify that Network I/O control for Management Traffic is configured for the highest share value.
Answer:
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
You might also like to view...
A _____________ allows multiple lines of text to be displayed.
(a) JTextField (b) JTextArea (c) JTextBox (d) JTextValue
________ refers to the area located between lines of text in a paragraph
A) Line spacing B) Overtype C) Alignment D) Indentation
If you are a marketing and sales manager, you would most likely use the ________ KPI
A) productivity by channel B) on-time delivery C) service satisfaction levels D) gross yield
Choose the correct pronoun in the following sentence.Each of the comets has _________ own orbit.?
A. ?its B. ?their