How has the use of scheduling programs on personal computers changed or impacted the construction industry?
What will be an ideal response?
The impact of the scheduling programs on the construction industry has been
quite extensive. During the 1970' s, most construction schedules were prepared on
mainframe computers. This was often a time-consuming and costly process. As such,
schedules on construction projects were not universally employed. Many schedules were
still prepared manually. With the programs that are now available on the personal
computers, the use of network schedules in the construction industry has increased
considerably.
You might also like to view...
A(n) ____ is a number that has no factors except itself and 1.
a. factor b. prime number c. even number d. odd number
A slide hammer has been fitted to an injector seized in a cylinder head, but will not pull it. What should be done?
A. drive injector downward into cylinder B. heat injector with an oxy-acetylene torch C. pull cylinder head, drive injector upward D. drill and pull injector with a screw extractor
A building is located 19 ft from the centerline of the inside lane of a curved section of highway with a 400 ft radius. The road is level; e = 0.10. Determine the appropriate speed limit (to the nearest 5 mi/h) considering the following conditions: stopping sight distance and curve radius.
What will be an ideal response?
? Identify and state the historical significance of the Helsinki accords.
What will be an ideal response?