A contractor is asked to purchase parts for a geothermal system.  The? supplier gives contractors double discounts of 8% and 5%.  If the parts were listed at $417.00, what is the final bill amount?

Fill in the blank(s) with the appropriate word(s).


$364.46

Trades & Technology

You might also like to view...

What is a master bar used for?

A. checking cylinder bore B. measuring rocker shaft bore C. checking cylinder block line bore D. measuring flywheel concentricity

Trades & Technology

For maximum efficiency, the duct system should be located within the building's:

A) interior walls B) insulation envelope C) mechanical room D) basement

Trades & Technology

Which registers in the register array of the 8085 can be used to supply an address to the address bus?

A) Registers H and L B) Program Counter C) Stack Pointer D) All of these can supply an address.

Trades & Technology

Heater function diagnosis should start with ______________

A) Thermostat testing B) Coolant condition and level C) Heater belt tension D) Hose clamp torque

Trades & Technology