Which of these is probably NOT a good step to take before starting the production process for a multimedia project?
a. Lock in the design so there are no further changes to delay production.
b. Establish limits on client review cycles to reduce cost overruns.
c. Set up an FTP site for sending and receiving production files.
d. Establish clear file naming and version control standards.
e. Check the state of your hardware and software to ensure reliability and capability, and integrate any upgrades.
a. Lock in the design so there are no further changes to delay production.
You might also like to view...
Select the false statement. Depending on the compiler:
a. A failed new operation can return a 0.
b. A failed new operation can throw a bad_alloc exception.
c. A failed new operation can throw an exception if the
What are the advantages and disadvantages of the use of the ARM’s BL (branch and load) subroutine call mechanism in comparison with the conventional CISC BSR (branch to subroutine) mechanism?
What will be an ideal response?
What is wrong with this code?
``` class Square { private: int side = 4; public: Square() {side = 4;} void SetSide(int s) {side = s;} }; ``` A. Nothing is wrong with the code. B. side can’t be initialized in the set. C. side can’t be initialized in the private section. D. no need to initialize in the constructor because it is initialized in the private section.
Themes and stationery can be used to add preset colors, fonts, effects, active graphics, and background images to your e-mail
Indicate whether the statement is true or false