______ is the construction of a temporary end of a wall or corner by allowing every other end of the stretcher brick to project halfway over the stretcher brick below.
A. Stretching
B. Parging
C. Toothing
D. Rack-back leading
Answer: C
Trades & Technology
You might also like to view...
Which of the following materials in NOT an insulator?
A. copper B. rubber C. glass D. plastic
Trades & Technology
The accompanying figure shows an assortment of mechanical symbols. What is the third symbol from the bottom?
A. Diaphragm valve B. Angle globe valve C. Angle gate valve D. Butterfly valve
Trades & Technology
The approximate amount of joint tape required to finish 1,000 square feet of drywall is _____
a. 210' b. 260' c. 300' d. 370'
Trades & Technology
Staggered interior features of an object are sectioned by the cutting plane line to align through the feature.
Answer the following statement true (T) or false (F)
Trades & Technology