A tower foundation rod "strike test" should be used to verify the exact tension level of each rod.
Answer the following statement true (T) or false (F)
False
A strike test performed by an experienced technician can aid in determining if a foundation rod has a lower tension value than other rods, but does not yield the exact tension level.
You might also like to view...
What is the total pulling tension when pulling a cable weighing 5 pounds per foot through a 500' conduit with a coefficient of friction of 0.35?
a. 176.75 b. 180 c. 875 d. 7,142
There are several reasons butt welds may be made as ____.
A. horizontal welds B. spot welds C. intermittent welds D. plug welds
While having a discussion, Technician A says that the Automotive Engine Rebuilders Association recommends prefilling hydraulic lifters. Technician B says that if they are underfilled, the valves can be held off their seats, which will make starting the engine difficult. Who is correct?
A. A only B. B only C. Both A and B D. Neither A nor B
Atrazine kills only small weeds or selected weeds if applied at a rate of _____
A) 5 to 10 pounds per acre B) 12 pounds per acre C) 1 pound per acre D) 2 to 4 pounds per acre