When additional work is required; parts price, availability, and arrival is needed so the service consultant can:
A. Negotiate a new provide time with the customer when additional work is approved
B. Determine what the technician might do to stay busy while waiting for the customer’s
answer
C. Both A and B are correct
D. Neither A nor B is correct
C. Both A and B are correct
You might also like to view...
Name two cut flower watering systems. Describe or sketch each indicating how it works and how it is laid out
What will be an ideal response?
Ethylene glycol antifreeze _____.
A. is the base product for all OE coolants B. is not used as the factory fill in modern vehicles C. contains silicates and phosphates D. all answers are correct
Which facility ground subsystem is also called the safety ground?
a. Earth electrode. b. Fault protection. c. Signal reference. d. Lightning protection.
When stacking materials such as bricks or block, do not stack materials beyond a _____
a. 3:1 height-to-base ratio b. 4:1 height-to-base ratio c. 5:1 height-to-base ratio d. 10:1 height-to-base ratio