When additional work is required; parts price, availability, and arrival is needed so the service consultant can:

A. Negotiate a new provide time with the customer when additional work is approved
B. Determine what the technician might do to stay busy while waiting for the customer’s
answer
C. Both A and B are correct
D. Neither A nor B is correct


C. Both A and B are correct

Trades & Technology

You might also like to view...

Name two cut flower watering systems. Describe or sketch each indicating how it works and how it is laid out

What will be an ideal response?

Trades & Technology

Ethylene glycol antifreeze _____.

A. is the base product for all OE coolants B. is not used as the factory fill in modern vehicles C. contains silicates and phosphates D. all answers are correct

Trades & Technology

Which facility ground subsystem is also called the safety ground?

a. Earth electrode. b. Fault protection. c. Signal reference. d. Lightning protection.

Trades & Technology

When stacking materials such as bricks or block, do not stack materials beyond a _____

a. 3:1 height-to-base ratio b. 4:1 height-to-base ratio c. 5:1 height-to-base ratio d. 10:1 height-to-base ratio

Trades & Technology