How can a preliminary work schedule of the project help the estimator?

What will be an ideal response?


A preliminary work schedule can be used by the estimator to estimate how long it will take to complete the project. This information is particularly useful when estimating job overhead costs and equipment rentals.

Trades & Technology

You might also like to view...

A ____ is typically a planar surface or a feature where the normal vectors point in the same direction.

A. feature with size B. slot C. tangent plane D. feature without size

Trades & Technology

? Identify and state the historical significance of affirmative action.

What will be an ideal response?

Trades & Technology

Moisture indicators are normally part of:

A) A liquid receiver. B) A filter drier. C) A suction accumulator. D) A sightglass.

Trades & Technology

If a liquid is removed from an enclosed container, the pressure on __________.

A. the inside wall of the container is less than the pressure exerted on the outside wall B. the inside wall of the container is more than the pressure exerted on the outside wall C. both sides of the container's walls will remain the same

Trades & Technology