If wire joint reinforcement is called for in the building specifications, install it at the proper height, which is normally every 16" in height or every other course.
Answer the following statement true (T) or false (F)
True
You might also like to view...
Which of the following is NOT a type of frame construction?
a. balloon b. prestressed c. platform d. braced
How is the top course of a vertical vessel’s sidewall jacket installation normally completed?
a. All bands and screws are installed as with other courses. b. The top band is left off until the beauty band is installed. c. The head jacket must be installed before the top course of sidewall jacket. d. Temporarily wire the jacket in place until the vessel head jacket is installed.
When axle windup is controlled by the rear leaf spring during acceleration, the suspension type is called a ________
A) Semi-trailing arm B) Hotchkiss drive C) Trailing arm D) Torque arm
Polling _______
A) is more efficient than interrupt-driven processor operation B) has the processor operate normally until a device signals that it requires servicing C) requires the processor to periodically check each device to see which if any of them require servicing D) None of the above