When installing hammer-driven pins and studs in soft concrete block, the drive pin or stud should be embedded in the concrete for at least _____.

a. 1/2" (13 mm)
b. 5/8" (16 mm)
c. 3/4" (19 mm)
d. 1-1/4" (32 mm)


d. 1-1/4" (32 mm)

Trades & Technology

You might also like to view...

Which of the following tools and supplies would you need to install a bathtub or shower?

a. 2-inch P-trap and necessary adapters b. ?-inch supply tubes c. jigsaw with fine tooth blade (for cutting countertop) d. basin wrench

Trades & Technology

The person that would communicate with the owner making sure that the service department receives the proper resources and support it needs is the ______

A) Service advisor B) Parts manager C) Shop foreman D) Service manager

Trades & Technology

Which battery rating is tested at 0°F (-18°C)?

A) Cold-cranking amperes (CCA) B) Battery voltage test C) Cranking amperes (CA) D) Reserve capacity

Trades & Technology

A certain type of mylar film costs 13.75 cents a sheet. What is the cost of 140 sheets?

What will be an ideal response?

Trades & Technology