Three-coat systems are a traditional, non-proprietary stucco mix that uses Portland cement, sand, and water applied to a total thickness of approximately ____ over a plastic or metal lathe.
A. one-half inch
B. one inch
C. two inches
D. three inches
Answer: B
You might also like to view...
Present standards and good work habits require that recovered refrigerant be ________.
A) Recycled B) Sent out to be discarded at an EPA-certified facility C) Sent back to the manufacturer D) Kept for 90 days
?Camshaft timing readings on OHC engines are taken before/after (choose one) the cylinder head is installed.
What will be an ideal response?
The most common water-transported items are petroleum and coal products
Indicate whether the statement is true or false
A vehicle being inspected under an OBD-II testing program and the MIL is ON. What will be the results of the inspection?
A) The vehicle will fail the test.
B) The vehicle will receive an 80% pass rate.
C) The vehicle will pass the test.
D) None of these