Lean practices will change the material requirements planning process by:

A) increasing the need for netting.
B) reducing the number of levels in the bill of material.
C) making the bill of material more complex.
D) eliminating the need for MRP.
E) increasing the need for offsetting.


B

Trades & Technology

You might also like to view...

A warehouse has coils of wire measuring 173 ft., 269 ft., 312 ft., 104 ft., and 92 ft.  How much wire is in the warehouse?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Topsoil should be stripped from the area to be excavated and stockpiled in a safe place to be used later where landscaping and lawns will be planted.

Answer the following statement true (T) or false (F)

Trades & Technology

Which character of the VIN indicates the engine code?

A) Eighth B) First C) Tenth D) None of these

Trades & Technology

Wallboard should not be installed in contact with the floor because it will _____

a. be hard to align adjoining panels b. wick up moisture and be damaged c. interfere with finish flooring installation d. make trim installation more difficult

Trades & Technology