To produce a drainage layer with horizontal siding, we generally use
A) 1-1/2-in.-wide horizontal strips nailed to studs before installing sheathing.
B) 1-1/2-in.-wide horizontal strips nailed to sheathing.
C) 2-in.-wide horizontal strips nailed to sheathing.
D) 2-in.-wide horizontal strips nailed to studs before installing sheathing.
E) none of the above.
E) none of the above.
You might also like to view...
What is coal? Where did it come from?
What will be an ideal response?
When evaluating multiple alternatives or projects, against what must they be compared, if they are (a) independent, and (b) mutually exclusive?
What will be an ideal response?
A quality engineer samples 100 steel rods made on mill A and 150 rods made on mill B. Of the rods from mill A, 88 meet specifications, and of the rods from mill B, 135 meet specifications.
a. Estimate the proportion of rods from mill A that meet specifications, and find the uncertainty in the estimate. b. Estimate the proportion of rods from mill B that meet specifications, and find the uncertainty in the estimate. c. Estimate the difference between the proportions, and find the uncertainty in the estimate.
A ____ is a membrane that is placed on the warm side of the walls and ceilings between the drywall and the insulation.
A. ridge B. vapor barrier C. barge rafter D. gypsum board