If the lead time is 1 week, the review period 4 weeks, the average demand 100 units per week and
the safety stock is 50 units, the target level will be:
A) 550 units. B) 300 units. C) 250 units. D) 150 units. E) 200 units.
A
You might also like to view...
What is the most effective way to handle an illegal or inappropriate question during an interview?
A) If you find the question harmless and you want the job, go ahead and answer it. B) Confront the interviewer about the illegal nature of the question. C) Storm out of the room in anger; after all, you wouldn't work for a company with such low ethics. D) Refuse to answer the question because it is your legal right to do so.
Done properly, sustainability encourages people to live in ways that can be maintained for the
A. long term. B. present. C. most profit. D. wealthy. E. individual.
_____ inventory is in transit to a customer or is located throughout distribution channels
a. Pipeline/in-transi b. MRO c. WIP d. Raw materials and semifinished items e. Just-in-time
A manufacturer of windows produces one type that has a plastic coating. The specification limits for the plastic coating are 30 and 70. From time to time the plastic coating can become uneven. Therefore, in order to keep the coating as even as possible, thickness measurements are periodically taken at four different locations on the window. 15 subgroups were observed, each consisting of four thickness measurements, with the following results: mean of the means = = 50.05, and average range = 8.85. Calculate 112. A manufacturer of windows produces one type that has a plastic coating. The specification limits for the plastic coating are 30 and 70. From time to time the plastic coating can become uneven. Therefore, in order to keep the coating as even as possible, thickness measurements are
periodically taken at four different locations on the window. 15 subgroups were observed, each consisting of four thickness measurements, with the following results: mean of the means = = 50.05, and average range = 8.85. Calculate the center line for the X-bar chart. the center line for the X-bar chart. A. 50.05 B. 8.85 C. 4.12 D. 3.34