What is the rationale behind the traffic channel indicating the reverse control channel to be busy in AMPS?

What will be an ideal response?


In the traffic Channel, the rationale behind the busy control channel is to be able
to reverse indicate to other MSs the status of shared control channel. This also
avoids collision.

Trades & Technology

You might also like to view...

What is the length of dimension A? Carry the answer to three decimal places.

Reduce all fractions to their simplest forms. Convert all improper fractions to mixed numbers. Provide answers in the following format:

Fraction: 3/4
Mixed number: 1 5/8

Trades & Technology

Plot the subdivision boundary given the northing and easting information shown in Figure P7–13. Identify the length to one-hundredth of a foot and bearing of each property line and place the information in the table. Plot the traverse at a scale of 1? = 50? on a B-size sheet and place the following items on your drawing:

Bearing of each line (course) ? Distance of each course ? Small circles at intersections of courses ? A point number at the end of each course ? POB ? Scale ? North arrow ? Title block: Erika Subdivision, Quincey Lane at Christopher Blvd., Jean, Wisconsin

Trades & Technology

In chickens, egg production begins with the release of the ____________________ from the ovary

Fill in the blank(s) with correct word

Trades & Technology

Nutrient requirement for fetal growth is greatest during which trimester of pregnancy?

A. Middle B. Last C. First D. There is no difference during any trimester

Trades & Technology