Suggest who might be the appropriate personnel in a construction firm to prepare a short interval schedule
What will be an ideal response?
A number of individuals might be appropriate to be assigned this task. The
important point is that this individual must be adequately informed about those tasks
completed in one week and which tasks must be performed in the near future. This
individual, possibly the superintendent, general foreman, project manager or project
engineer, must be able to grasp all the tasks involved along with the various constraints
that might be imposed. These should be developed with input specifically requested from
the various first line supervisors, subcontractors, and key suppliers.
You might also like to view...
An organization that has contributed to the development of the safety movement in the United States is:
A) National Safety Council B) National Society of Safety Engineers C) National Safety Management Society D) All of the above
When troubleshooting or checking original installations, which two wiring diagrams would be most beneficial to an electrician?
What will be an ideal response?
Is the test procedure to determine the fire resistance or sound insulation of a floor (or a wall) in a building described in a building code or in a construction standard?
Use the figure below to answer the following questions.
When installing single conductor cables in tray systems with conductors size 4/0 and larger, they must be _____.
a. installed in multiple layers b. installed in a single layer c. spaced one cable diameter apart d. derated according to the number of conductors in the tray