When installing 4' × 8' subfloor panels, how far should you measure in from one side of the rim joist?

a. 2'
b. 4'
c. 6'
d. 8'


Answer: B

Trades & Technology

You might also like to view...

The first step in applying the building code to a project is to ______.

A) determine if the building is provided with an automatic sprinkler system. B) determine the number of exits from the building at the ground floor. C) determine the occupancy classification of the building. D) determine the width of open spaces around the building.

Trades & Technology

Conservation tillage replaces the older methods of clean tillage that left bare soil exposed during the nongrowing season

Indicate whether the statement is true or false

Trades & Technology

Hormones are produced by endocrine glands or tissues

Indicate whether the statement is true or false

Trades & Technology

Match the term with its definition

A. Accomplished at temperatures above 842°F. B. Caused by excessive bending and straightening of tubing. C. Operation that causes one end of a copper tube to expand at an angle for flare nut connection to system. D. Operation that allows two tubes of equal diameter to be joined together. E. Operation of heating and cooling tubing to make it softer. F. Removal of burrs and rough edges from tubing. G. Accomplished at temperatures under 842°F.

Trades & Technology