You are computing proper ventilation for a house with 1500 square feet of floor space, 8 foot ceilings, and you wish to have 1 air change per hour. What is the total ventilation in CFM required?
A) 200 CFM B) 350 CFM C) 100 CFM D) 110 CFM
A
Trades & Technology
You might also like to view...
A fast way of locating a weak cylinder is with a cylinder power balance test. Then a ____________________ or leakage test can be performed to further pinpoint the cause of the problem.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
Liquid waste collected in the bladder is called urine
Indicate whether the statement is true or false.
Trades & Technology
All sources of stress on the job can be eliminated, if precautions are taken.