Why is completing a project like eating an elephant?

What will be an ideal response?


Projects are large, joining together a multitude of smaller tasks. Their size can be as intimidating as eating an elephant, on the surface appearing to be too much to accomplish.

Trades & Technology

You might also like to view...

During construction of the building, drawings are changed to accommodate the installation of equipment and the changes are made on ________ drawings.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

After aluminum coupons and backings have been properly cleaned and prepared, they should be welded

within _____. a. 1 hour b. 45 minutes c. 30 minutes d. 10 minutes

Trades & Technology

Ozone is formed by the action of

A. lightning. B. electrical equipment. C. ultraviolet radiation. D. all of the above.

Trades & Technology

A TI 36X calculator is set in binary mode (BIN).  The calculator display show 110100101.  If the calculator is set to decimal (DEC) mode, what would the display show?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology