Solve the problem.A textile company has specific dyeing and drying times for its different cloths. A roll of Cloth A requires 55 minutes of dyeing time and 45 minutes of drying time. A roll of Cloth B requires 70 minutes of dyeing time and 25 minutes of drying time. The production division allocates 2220 minutes of dyeing time and 1300 minutes of drying time for the week. How many rolls of each cloth can be dyed and dried?

A. 2 rolls of Cloth A, 47 rolls of Cloth B
B. 20 rolls of Cloth A, 16 rolls of Cloth B
C. 13 rolls of Cloth A, 38 rolls of Cloth B
D. 9 rolls of Cloth A, 30 rolls of Cloth B


Answer: B

Mathematics

You might also like to view...

Solve the problem.A new piece of equipment cost a company $54,000. Each year, for tax purposes, the company depreciates the value by 25%.What value should the company give the equipment after 8 years?

A. $5,406 B. $1 C. $3 D. $7,208

Mathematics

Express using positive exponents. Then, if possible, simplify.-3

A. 27c3
B.
C.
D. - 

Mathematics

Solve the problem.The strain S on a small experimental I-beam under a central point load of x pounds is given by (see figure below). Use a Taylor polynomial of degree 2 at x = 0 to estimate the strain on the beam when loaded with a 5 lb point load. Round to the nearest hundredth.

A. -0.31 B. 1.19 C. 1.53 D. 2.27

Mathematics

Round the following decimal to the indicated place. 16.1064; thousandths

A. 16.106 B. 16.116 C. 16.107 D. 16.096

Mathematics