Solve the problem.The phone company needs to install a line from point A on shore to an island that is 7 miles away from point B, as shown in the drawing below. The cost associated with installing underwater cable is $18,600 per mile, while the cost associated with installing cable over land is $9000 per mile. For the project to be completed at minimum cost, how much of the cable should be installed over land? In other words, at what distance from point A should the company stop laying cable over land? Round your answer to the nearest tenth of a mile, if necessary.7 miles
? 10 miles
A. 5.7 miles
B. 6.1 miles
C. 6.9 miles
D. 8.1 miles
Answer: B
Mathematics
You might also like to view...
Write an equation for the parabola with vertex at the origin.Focus (5, 0)
A. x2 = 20y B. y2 = 20x C. y2 = 5x D. x2 = 5y
Mathematics
Identify the shape of the solid.
A. cylinder B. sphere C. cone D. circle
Mathematics
Simplify. Write your answers in the form of a+bi, where a and b are real numbers.-4i(-5 + 4i)
A. 20i - 16i2 B. 16 - 20i C. 16 + 20i D. -16 - 20i
Mathematics
Multiply or divide as indicated and reduce to lowest terms. ÷
A.
B.
C.
D.
Mathematics