What is the principal reason for a “flow-through” or conduit clause?

What will be an ideal response?


The principal reason for a “flow-through” or conduit clause is to ensure that
subcontractors commit themselves to the performance requirements of the
prime contract. This way, the use of many contracts does not inadvertently
create a gap in the performance obligations of the prime contractor to the
owner

Trades & Technology

You might also like to view...

A stair constructed without risers is generally called a(n)

A) closed-riser stair. B) hollow stair. C) open-riser stair. D) no-riser stair.

Trades & Technology

La longitud de chapa más usada es de ______.

a. 12 pies (3,65 m) b. 10 pies (3,04 m) c. 12 pies, 3 pulgadas (3,65 m, 7,62 cm) d. 10 pies, 3 pulgadas (3,04 m, 7,62 cm)

Trades & Technology

A capacitance transducer consists of two plates of diameter 2 cm each, separated by an air gap of 0.25 mm.

Find the displacement sensitivity.


What will be an ideal response?

Trades & Technology

The parking or emergency brake on a heavy vehicle can only be held in position by something that cannot leak away, like:

a. Hydraulic pressure. b. Spring pressure. c. Air pressure.

Trades & Technology