In a ____, lateral stability may be increased by adding bridging at intervals between the joists or ribs.
A. one-way ribbed system
B. one-way solid slab-and-beam system
C. two-way solid slab-and-beam floor system
D. two-way flat-plate floor system
Answer: A
Trades & Technology
You might also like to view...
What does the low-voltage thermostat operate?
What will be an ideal response?
Trades & Technology
"r" selected species
What will be an ideal response?
Trades & Technology
De-burring tools are used for:
A) Preparing a compressor head before applying a head gasket. B) Removing rough edges from electrical wiring. C) Removing splinters from wood frame members. D) Removing the small burr left by pipe cutters.
Trades & Technology
Noise ________
A) is produced by man-made sources only B) is the primary cause of error in fiber optic communications C) can result from natural sources D) is greater when the SNR value is larger
Trades & Technology