If a job is delayed due to late delivery of materials, the crew leader should _____.

a. demand a discount from the supplier to compensate for the delay
b. get in the habit of checking with the supplier in advance of the scheduled delivery
c. contact the home office and advise them to drop the supplier from their list
d. refuse the late delivery and re-order the materials from another supplier


b. get in the habit of checking with the supplier in advance of the scheduled delivery

Trades & Technology

You might also like to view...

The parts that are MOST-Likely directional are:

A. torsion bars B. bushings C. leaf springs D. insulators

Trades & Technology

List the three drive sizes for light-duty impact wrenches and two drive sizes for heavy-duty wrenches/.

What will be an ideal response?

Trades & Technology

What effect does moisture have on a refrigeration system?

A) Increased head pressure B) Corrosion of metals and freeze up at the expansion valve C) lower than normal superheat D) Increased low side pressure

Trades & Technology

The torque of a squirrel-cage induction motor will be maximum when the phase angle between the stator and rotor fields is _____.

A. 0° B. 90° C. 180° D. 270°

Trades & Technology