If a job is delayed due to late delivery of materials, the crew leader should _____
a. demand a discount from the supplier to compensate for the delay
b. get in the habit of checking with the supplier in advance of the scheduled delivery
c. contact the home office and advise them to drop the supplier from their list
d. refuse the late delivery and re-order the materials from another supplier
b
You might also like to view...
A heater does not supply enough heat and the coolant level and flow are correct: Technician A says that a misadjusted heater control could be the cause. Technician B says that a bad thermostat could be the cause. Who is correct?
A. Tech A B. Tech B C. Both D. Neither
All livestock have an accessory olfactory organ, called the vomero-nasal organ located
between the mouth and nasal cavities that provides a keen sense of smell. A. True B. False
The purpose of an electrical overload device is to protect against:
A) Power surges. B) Excessive voltage. C) Excessive resistance. D) Excessive current.
Angular surfaces are never dimensioned as coordinates, as angles and degrees, or as a flat taper.
Answer the following statement true (T) or false (F)