Drive train assemblies that require the use of a power bolting tools to torque fasteners include: hub adapter, slip ring, and generator brushes.
Answer the following statement true (T) or false (F)
False
Drive train assemblies include: hub adapter, main bearing pillow block, gearbox pillow blocks, and gearbox compression coupling.
You might also like to view...
Cable is strung from a wind turbine to a distribution panel. The cable has 14 spans of 24 feet? between poles. 11 feet of cable takes power from the turbine to the first pole and 13 feet of cable takes the power from last pole to the distribution panel. What is the length of cable need for this system?
Fill in the blank(s) with the appropriate word(s).
The construction drawings of a building project are prepared during the
A) construction phase of the project. B) SD stage of the project. C) DD stage of the project. D) CD stage of the project. E) preconstruction phase of the project.
____________________ produce feeder lambs to finish for market
Fill in the blank(s) with the appropriate word(s).
Who is the final authority for determining the required vertical clearances for service conductors?
a. Underwriters Laboratories b. National Electrical Code® c. National Electrical Manufacturers Association d. Utility Company