Blockout and metal connector sizes and locations needed in constructing floor/roof fabrication details are determined from the ____.
A. engineering calculation sketches
B. framing plan
C. shop drawings
D. checkprints
Answer: B
You might also like to view...
Which is the most common method of attaching a kingpin to a trailer upper coupler assembly?
A. SAE Grade 8 fasteners B. SAE Grade 5 fasteners C. Welding D. Lockpin
An aquic soil moisture regime connotes a higher degree of soil moisture saturation than an ustic one
Indicate whether the statement is true or false
Technician A says that a transfer case may use GL-4 gear lube such as SAE 80W-90. Technician B says that a transfer case may use automatic transmission fluid (ATF) such as Dexron III. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B
A bag of masony cement holding a volume of 1 cubic-foot is sufficient for making mortar to lay 60 economy-size bricks in the running bond pattern.
Answer the following statement true (T) or false (F)