When estimating finish hardware, a ____ is often specified on larger projects; otherwise a finish hardware price is obtained from a subcontractor.

A. cash allowance
B. cash overrun
C. cash shortage
D. cash requirement


Answer: A

Trades & Technology

You might also like to view...

To thrive as an organized society, humans must remove significant amounts of water, use it in many different ways, and return almost all of it to the cycle

Indicate whether the statement is true or false

Trades & Technology

In some locales, wind and seismic forces require the use of a(n) ____ to improve the lateral (side-to-side) strength of an exterior wall.

a.shearwall b.embankment c.buttress d.abutment

Trades & Technology

Why should technicians fill out paper work completely and correctly?

a. It’s required and the tech will be fired if he doesn’t. b. Customers need a complete record of what was done in case it breaks down. c. It is the most efficient method of communication between the job and the office.

Trades & Technology

A diode installed across a coil with the cathode toward the battery positive is called a(an) ________

A) Transistor B) Forward-bias diode C) SCR D) Clamping diode

Trades & Technology