The final tool used to smooth the edge of a completed countertop laminate installation is a _____.

a. belt sander
b. bastard file
c. single-cut file
d. plane


Answer: C

Trades & Technology

You might also like to view...

Los concretos que se consi- deran convencionales tienen resistencias tan altas como _____ psi.

a. 1,000 b. 4,000 c. 7,000 d. 14,500

Trades & Technology

The electrical disconnect box for a rooftop unit is:

A) Mounted on the unit. B) Mounted on a separate post next to the unit. C) Not required for rooftop installations. D) Located inside to protect it from the weather.

Trades & Technology

Before beginning an insulation project, you should always complete a _____

a. safety data sheet b. materials and equipment inventory c. job hazard analysis d. labor estimate

Trades & Technology

What material is recommended for a vent connector on all non-condensing, induced-draft furnace

installations? a. PVC pipe b. Stainless steel pipe c. Single-wall pipe d. Type B vent pipe