. Because of the massive weight of concrete being placed all at once for one-way solid slabs, the shoring system must be _____.

a. constructed entirely of steel
b. designed by a registered architect
c. left in place until the concrete is fully cured
d. designed by a structural engineer


d. designed by a structural engineer

Trades & Technology

You might also like to view...

Price and cost do not always mean the same thing

Indicate whether the statement is true or false

Trades & Technology

State why payback analysis should be used only as a supplemental analysis tool when an economic study is performed.

What will be an ideal response?

Trades & Technology

How much outside air should be admitted to a space?

What will be an ideal response?

Trades & Technology

What is the reason for using different relay valve crack pressures in a tractor trailer semi combination?

A. intensify tractor braking B. ensure the tractor brakes actuate ahead of the trailer brakes C. ensure the trailer brakes actuate ahead of the tractor brakes D. balance the braking on the tractor and the trailer

Trades & Technology