When drawing a concrete slab foundation layout, after the outer edge is laid out, you should use the ____ command to locate the interior side of the stem wall around the slab at the garage area.
A. TRIM
B. OFFSET
C. ARRAY
D. COPY
Answer: B
You might also like to view...
On hand-cranked, manually operated, pipe-cutting machines, the crank handle can be on the _____ or connected through a flexible cable.? ?
Fill in the blank(s) with the appropriate word(s).
In general, a system that is overcharged will have:
A) A high subcooling and a low superheat. B) A low subcooling and a low superheat. C) A low subcooling and a high superheat. D) A high subcooling and a high superheat.
Architectural drawings, known as procedures, are prepared by professional architects or designers for any home or commercial building before the actual construction can begin.
Answer the following statement true (T) or false (F)
Identify the ASME standard titled Metric Drawing Sheet Size and Format.
Fill in the blank(s) with the appropriate word(s).