Solve the problem.An automotive glass plant must be able to fill orders for 230 truck windshields, 350 auto windshields, and 310 RV windshields. Because the first shift crews are more experienced, they are each able to make 7 truck windshields, 12 auto windshields, and 9 RV windshields. The second shift crews are able to produce 4 truck windshields, 12 auto windshields, and 7 RV windshields. The more experienced first shift crews cost the company $360.00 per crew per shift and the second shift crews each cost $310.00 per shift. The company's facilities will handle at most 50 crews on each shift, and they must have at least 10 crews come in to keep the plant running. How many first shift and how many second shift crews should they schedule to minimize costs?
A. 51 first shift crews and 17 second shift crews
B. 43 first shift crews and 24 second shift crews
C. 28 first shift crews and 10 second shift crews
D. 37 first shift crews and 36 second shift crews
Answer: C
You might also like to view...
Write 2 9 = 512 in logarithmic form. For example, 2 3 = 8 becomes log 2 8 = 3 in logarithmic form.
A. log 2 9 = 512 B. log 512 2 = 9 C. log 512 9 = 2 D. log 2 512 = 9 E. log 9 512 = 2
The average student enrolled in the 20-week Court Reporting I course at the American Institute of Court Reporting progresses according to the rule
?
?
where
measures the rate of change in the number of words/minute of dictation the student takes in machine shorthand after
weeks in the course. Assuming that the average student enrolled in this course begins with a dictation speed of 62 words/minute, find an expression
that gives the dictation speed of the student after
weeks in the course.
What will be an ideal response?
Simplify. Assume variables represent nonnegative values.
A. 7xy
B. 7xy
C. xy
D. 7xy
Use properties of limits to find the indicated limit. It may be necessary to rewrite an expression before limit properties can be applied.(x - 4)(
- 2)
A. 0 B. does not exist C. 2 D. 4