With separate contracts, describe three options available to the owner for managing the contractor’s work on the project.
What will be an ideal response?
The owner may pay the general contractor to do the coordination, pay the architect/engineer or a construction management company, or handle it themselves.
You might also like to view...
When a diode is tested using a DMM set in diode test mode, and the reading indicates continuity in both directions:
A. the diode is shorted B. the diode is open C. the diode is functioning properly D. the diode is fried
Which of the following systems is most suitable where a pond or lake is located fairly close to the building?
A) water-to-air open loop system using the pond water B) water-to-air closed loop system with loop sunk in pond C) air to air system with outdoor unit located near the water D) air to water system using the pond as a buffer tank
If three 75 W lamps are connected in parallel across a 125 V source, IT equals ________
A) 180 mA B) 1.8 A C) 18 A D) 18 mA
If the brake pedal height is incorrect, check the rear brake adjustment.
Answer the following statement true (T) or false (F)