Find the work done by a force F= i+5j+7k that moves an object from the point (1,0,3) to the point (5,3,8) along a straight line. The distance is measured in meters and the force in newtons.


e. 54J

Mathematics

You might also like to view...

Write the equation for the plane.The plane through the point P(4, 5, -7) and normal to n = 3i + 3j + 3k.

A. 4x + 5y - 7z = 6 B. 3x + 3y + 3z = 6 C. -4x - 5y + 7z = 6 D. -3x - 3y - 3z = 6

Mathematics

Find the distance d(P1, P2) between the points P1and P2.P1 = (-6.6, -5); P2 = (-6.3, -5.8)

A. 0.73 B. 16.824 C. 1.676 D. 0.854

Mathematics

Find the probability.Two 6-sided dice are rolled. What is the probability the sum of the two numbers on the die will be 6?

A.  
B. 1 
C. 5
D.  

Mathematics

To find the number of units that gives break-even for the product, solve the equation R = C. Round your answer to the nearest whole unit.A manufacturer has total revenue given by the function R = 258x and has total cost given by where x is the number of units produced and sold.

A. 284 units B. 232 units C. 3430 units D. 4198 units

Mathematics